Rough electrical installation: solid safety and comfort
Rough-in work is the initial and most critical stage of creating an electrical system. It is at this stage that the foundation is laid—a foundation that will subsequently be concealed beneath the final finish. All processes are carried out in strict accordance with the required technical sequence and regulatory standards.
Key stages:
1.Precise marking
Transferring design layouts onto surfaces, taking into account the planned placement of furniture and equipment as well as finished floor levels.
2.Preparation of the structural design
Diamond core drilling for socket boxes, wall chasing, and preparing recesses for distribution boards.
3.Installation of cable lines::
Installation of power and low-voltage networks in compliance with regulatory tolerances and standards for cable fastening and protection; termination of junction boxes.
4.Assembly of protection systems:
Installation of automation systems and connection of components that protect the network against faults.
5.Пусконаладка и подготовка к сдаче
Установка временного освещения и розеток для нужд отделочников, обязательная проверка и маркировка всех линий, подготовка объекта к промежуточной сдаче заказчику.